All survey requirements for the construction the 330 Bed Correctional Facility expansion including associated earthworks, drainage, substations, large concrete slab pours, pre-cast walls, hold down bolts, Macern Fencing, retaining walls, recreational areas, car parks and other hardstand, As Constructed reports and drawings, whilst dealing with Maximum Security Clearance protocols.
Cessnock Correctional Centre Expansion – numerous sub-contractors
All survey requirements for the construction the 330 Bed Correctional Facility expansion for sub-contractors including Hanna Bros, JR Block & Bricklaying, Nepean Engineering and Stowe Australia